That Look Like They Were Always There.

Master suites, home offices, second stories, and detached ADUs — designed to match the original brick, roof line, and trim so nothing looks bolted-on.

What's Included

Every Room Project.
Fully Scoped, Fully Priced.

We put the entire scope in writing so you know exactly what you're getting — down to the fixture line and finish spec.

  • Architectural drawings and full permit package
  • Matching brick, siding, roof line, and trim details
  • Foundation, framing, roofing, and finish under one contract
  • Electrical panel upgrades and HVAC extensions included
  • ADU / casita builds for rental or multi-generational use
How It Works

From First Call
To Final Walkthrough.

  1. Step 01
    Feasibility

    Site visit, zoning check, and rough budget range.

  2. Step 02
    Design + permit

    Stamped drawings, city submittal, engineered specs.

  3. Step 03
    Build

    Foundation to finish under one in-house crew.

  4. Step 04
    Warranty

    5-year workmanship warranty on the entire addition.

Common Questions

Answers Before You Call.

How long does an addition take?+

Most single-room additions run 10–14 weeks. Second stories and ADUs typically run 16–24 weeks.

Do you handle permits and drawings?+

Yes. We provide stamped architectural drawings and pull every required permit.

Can you match a 40-year-old brick?+

In most cases yes — we source matching brick or blend from a discreet donor location.